Fog Hashing is now Fog Computing.Read the announcement
AI data center · FogPod Air

Air-cooled AI,
ready to run.

FogPod Air is an air-cooled inference pod in standard containers, sized for the edge, colocation or a quick pilot.

Talk to sales
Rendering of a FogPod Air site on a dark studio ground: the 40 ft hall container with five doors along its side, the power module container beside it, and two heat rejection skids at the left

A container data hall,
built around the airflow.

Up to 280 kW of IT in a standard 40 ft container, with smooth airflow and comfortable room to work in.

Cutaway rendering of the FogPod Air hall: rack rows along the container under the yellow busway and coolant piping, the distribution cabinets at the far end, and two heat rejection skids outside

Chilled-water units sit between the racks, with more capacity installed than the pod can draw. One can be out for service and nothing slows down.

Outdoor units on their own skids beside the container. The hall leaves the factory complete, and the cold source lands next to it and connects on site.

The switchboard, UPS and 5 minutes of battery. Two independent feeds reach every rack, so one path can go down without the pod noticing.

The racks exhaust into the contained hot aisle and the in-row units draw straight from it, so exhaust heat never mixes back into the room.

Contained and fed at 25°C supply air, whatever the ambient is doing between -20 and +45°C outside.

Built for
RTX PRO fleets

NVIDIA RTX PRO 6000 Blackwell Server Edition, single card with a blower shroudNVIDIA RTX PRO 6000
NVIDIA HGX B300 baseboard, eight GPU modules on the trayNVIDIA HGX B300
NVIDIA H200 baseboard, eight SXM modulesNVIDIA H200
NVIDIA H100 baseboard, eight SXM modulesNVIDIA H100
RTX PRO server chassis in exploded view, eight GPUs fanned above the trayRTX PRO server

Easy to start,
simple to deploy.

Air cooling takes the specialist work out of the pod, so a first site can be proved quickly and run by the crew already there.

Air, colo ready

Cooling any tenant can move into and any crew can run. No liquid loop, no new skills.

Best for the start

One pod under 300 kW proves the business model at pilot capex. Then take it to a bigger site.

Prefabricated in the factory

Built and tested while your site is prepared: fast to deploy, little on-site work.

Aerial of a Fog Hashing container craned onto its pad at a savanna site in Africa, crew guiding it down

Prove it with one pod.