Aerial of a 10MW hydro-cooled mining site, container rows and their dry coolers on the pad beside the substation feeding them
Industrial Mining

Complex to build,
simple to run.

We manufacture the cooling, supply the power gear, and deploy megawatt blocks in days, so your site energizes on schedule and stays online after it does.

Looking down the CDU skid inside a container: rows of clear filtration housings on stainless clamps, valve handles paired red and blue for flow and returnThe dry cooler bank on a Fog Hashing hydro container, seen from below: blue fin blocks behind the white frame, the classification-society plate and nameplate alongsideA Fog Computing technician walking the aisle between two immersion rows

Industrial mining,
made straightforward.

Every tank, manifold, panel and container is built and tested on our own line before it ships, to CSA, UL or CE as your site needs. Six years of in-house R&D and 400MW deployed across 40 countries, behind one set of drawings, so what lands on your pad is what passed FAT.

Hydro and immersion loops hold the chips at a steady temperature from -30°C to 50°C ambient. Miners stay online where an air-cooled farm throttles or trips, and boards stop cycling hot and cold every time the fans ramp.

Every miner, pump and dry cooler switches locally or from the Fog web portal, with full API access. One year of FogCare is included, FogCare+ runs to ten, and spare parts sit at three levels, so a failed pump is a part on a shelf rather than a shipment.

Liquid cooling,
efficient either way.

Factory pre-assembled, built to order in 30 to 50 days. What differs is block size, form and which miners it takes.

Inside an HC40-S2400: shoe-box hydro miners racked floor to ceiling down both walls, a coolant hose looped to every one

H Series · Hydro cooling

  • High-density
  • Easy maintenance
  • Smart monitoring
Cooling capacity
200kW to 2.4MW
Form
45ft, 40ft container or skid
Miners
Antminer, WhatsMiner, SealMiner, Auradine
Inside a BC40: two rows of immersion tanks down the container, coolant hoses dropping to each from the ceiling run

B Series · Immersion cooling

  • Harsh-environment ready
  • Stable running
  • Smart monitoring
Cooling capacity
100kW to 1MW
Form
40ft container or skid
Miners
Air- or immersion-ready

Power gear,
in weeks.

75kVA to 500MVA, up to 345kV. US-stocked pad-mount units ship in 14 days, so the transformer does not hold your energization date.

1200A to 4000A, engineered to your single line and built in around eight weeks. UL, cUL, ANSI/IEEE, NEMA and DOE listed.

The cooling and the power gear come from one company, so the drawings agree and there is one number to call when the schedule slips.

A substation from the air, gantry steel up and the main transformer set on its padA green Fog Hashing pad-mount transformer palletized on the factory floorFour switchboard cubicles in a row on the plant floor, doors closed
Power infrastructure

Running sites,
in operators' words.

Four air-cooled containers running on the Simple Mining site, dry coolers open above each
10MW Liquid-Cooled Site in Iowa

“The site has now run 90 days without an interruption. What I did not expect is that Fog stayed involved after deployment, and their engineers still walk through our operating questions with us every month.”

12MW · IOWA, USA
The two Fog Hashing BC40 immersion containers on the Missouri site, dry coolers alongside, seen from the air
From Air to Immersion in Missouri

“Absolutely thrilled about making the move. The uptime is there, it is so much easier on the equipment, and the dust and dirt stay outside with the dry coolers. We will never go back to air after taking the jump.”

4MW · MISSOURI, USA
A container standing in deep snow
North Dakota, USA

“I’m truly amazed. The BC20 containers outperformed every expectation in -30°C extremes—far beyond my expectations. Cold resistance? More like cold dominance. I think it’s time we order more.”

BC20 · -30°C OPERATION
See it running

Walk a site, or walk the line.

Specifications are one thing. We will bring you onto the factory floor to watch your own containers being built and tested, and where an operator agrees to it, put you in front of a site already running. Tell us which and we will arrange it.

Arrange a visit
A Fog Computing technician torquing a coolant loop flange during factory acceptance testing

Put megawatts on your pad.