AI factories,
built faster.
We design and manufacture the infrastructure, develop the sites, and operate colocation, so you bring AI compute online in under 9 months.

Go live in months,
not years.
Power, cooling and compute are all modular and prefabricated, so the system is easy to deploy and scale.
Built and tested in the factory, so most on-site work becomes simple assembly.
One owner from power-in to compute-out, backed by trusted industry partners. No gaps between vendors.
Modular products,
built to fit.
We design everything around the compute, power and cooling both, and manufacture complete blocks rather than building on site. Blocks group into the campus you need.

The one that scales. Factory-built modules, liquid cooling with air, from 1 MW to 100 MW and beyond.
Learn more

How we work
with you.
Three ways a project reaches us. The system underneath is the same in all three; what changes is how much of it is yours at the end.
You have power and land
We develop it into an AI data center: site evaluation, design, energized. That also means proving the business case, backing the financing, and lifting the value of the site.
You need it built faster
Modular, prefabricated AI infrastructure, aimed at under 9 months from site design to go-live. Most of the work happens in our plants, so there is less on site and one contract instead of a vendor list.
You want one ready to run
We hold a pipeline of powered land and are converting it into colocation sites. A neocloud or a compute buyer takes capacity that already exists, with no build to wait through.

Where the 9 months
comes from.
A conventional build waits on itself, one phase after another. We run the factory and the site at once, dispatch 90 days after the design settles, and go live in under 9 months.
Schedule comparison, months. Site design: conventional build from 0 to 3, Fog from 0 to 1.5. Permitting: conventional build from 2.5 to 6, Fog from 1 to 3. Site construction: conventional build from 5.5 to 11, Fog from 1.5 to 4. Manufacturing: conventional build from 3.5 to 12, Fog from 1.5 to 4.5. Shipping: conventional build from 10.5 to 12, Fog from 4.5 to 5.5. MEP installation: conventional build from 11.5 to 14.5, Fog from 5.5 to 6.5. Testing and commissioning: conventional build from 14 to 16, Fog from 1.5 to 8.5. Conventional total 15+ months. Fog total <9 months.6 months saved.
Why build with us.
One partner, full lifecycle
From design through commissioning under one accountable partner. One contract, no integration gaps between vendors.
North American delivery capability
400MW delivered in our mining line, with local design, delivery and support teams on the ground in North America.
UL and CSA experience
The H2400-M Cluster and the B100 Cluster are certified as whole products. Everything else is engineered to UL and CSA component and design standards, and we know the permitting, insurance and AHJ path a build must clear.
Industrial chain and ecosystem
Partnerships with leading industry players and membership of NVIDIA Inception give early projects momentum.