Build AI faster with
Prefabricated Infrastructure
We bring AI compute online in months, on infrastructure we design and manufacture, and powered land we help develop with you.
From factory floor
to running site.
We manufacture AI data center infrastructure and carry it as far as you need, up to a finished site to lease or to buy.
We design and manufacture the power, cooling and compute halls, and deliver them as one build.
We help develop powered land into bankable AI-ready projects, and connect them with potential compute buyers.
We lease or sell ready-to-run sites on land that already has power, built out for dense GPU racks.
The full stack,
power to compute.
A Fog site runs from the high-voltage intake to the heat leaving the roof. We engineer every block in between and deliver the site as one system.
Grid, gas or behind the meter, transformed and metered. The megawatts are qualified before the halls are designed.
Prefabricated switchgear, UPS and BESS skids, factory tested, feeding every hall.
Liquid-ready modular halls, GPU-dense, shipped finished and bolted together on the pad.
CDU and hydro modules driving the direct-to-chip liquid loop between power and compute.
Dry coolers and chillers sized for the climate rather than the worst case.
Built for the demands of AI,
ready for what's next.
Every product is a complete data center, built and tested in our own factory. They differ by scale and by how they cool.




Pair with
Frontier AI Engines
NVIDIA GB300 NVL72
NVIDIA GB200 NVL72
NVIDIA HGX B300
NVIDIA RTX PRO 6000
NVIDIA H200
HGX PlatformPowered land,
developed faster.
We hold a pipeline of powered land and co-develop it into AI-ready sites with neoclouds and colocation operators, who are scaling faster than they can build. Our prefabricated power and cooling infrastructure gets them running in months.



A global portfolio
of compute sites.
North America, Australia, the Middle East and Africa. Different grids, different climates, the same modules on the pad.
Built, energized,
still running.

“Energized ahead of schedule in West Texas heat. The prefab approach removed months of on-site work.”

“One team from power study to racks online. Remote-grid constraints handled without a single redesign.”

“50°C ambient, zero water. The cooling design held its rating through the full first summer.”
Making the pivot to AI
A mining site already has the power, the land and the crew. The guide walks the conversion end to end: what a pilot costs, what it earns, and what has to change.
Read the pivot guide