Pick a platform and a GPU count. The sums use published vendor maximums, size for maximum draw, and round up to whole systems and whole racks.
GPUs in,
kW out.
You buy whole systems and fill whole racks, so the sums round up. Every figure the sum uses is listed with its source below the panel.
GB200 NVL72 ships as a whole rack, so systems per rack does not apply.
Rounded up to 2 systems.
This is IT load only. Cooling and distribution overhead sit on top; size them with the PUE savings calculator.
The site cites 120 to 132 kW per rack for GB200 NVL72, and the tool sizes at 132 because provisioning is done at maximum draw.
DGX figures are the vendor maximums from the NVIDIA DGX user guides. H100/H200 10.2 kW, B200 14.3 kW, B300 14.5 kW per system. The table below links each one.
The figures,
per unit.
Published maximums, one source per platform. The table reads fine with JavaScript off.
| Platform | GPUs per unit | kW per unit | Source |
|---|---|---|---|
| GB200 NVL72 | 72 | 132 | This site, Mining-to-AI guide |
| DGX H100 / H200 | 8 | 10.2 | NVIDIA DGX H100/H200 User Guide |
| DGX B200 | 8 | 14.3 | NVIDIA DGX B200 User Guide |
| DGX B300 | 8 | 14.5 | NVIDIA DGX B300 User Guide |
The table carries maximums because that is what provisioning is for. A cluster rarely sits at its nameplate draw, but the feeders, transformers and cooling plant are sized so it can, and a sum built on typical draw becomes a constraint the first week the schedulers keep every GPU busy.
Sizing questions,
short answers.
Why size at maximum power?
Provisioning is done for the worst case. Feeders, breakers and cooling are sized so the site holds when every GPU is busy, and the vendor maximums are the published figure for that case. Typical draw sits below it, and the margin is yours, not the grid operator’s.
Why is GB300 NVL72 missing?
The GB200 range is already cited on this site, on the page the table above links. No GB300 per-rack figure is cited anywhere on this site and no vendor document publishes one, so the platform waits. It joins the list the day a citable figure exists.
What about cooling power?
The sums here are IT load only. Cooling and distribution overhead sit on top, and the PUE savings calculator prices them per year.